District Construction Update
Week of August 7th
Week 12 - Projects Beginning to Wrap Up
Many construction projects in the district are at or nearing completion. We anticipate all major construction wrapping up in the next two weeks, with the possibility of some minor details and finishes to complete after that.
ONGOING PROJECTS
ROOF REPLACEMENT
The roofing contractors have completed installing the new rubber roof. There are still finishing details that need to be completed, making the roof over 90% complete.
UPPER WALL EIFC
Contractors from MUZA Sheet Metal will be back on site this week finishing up installation of the new horizontal sheet metal on the upper EIFC. The new siding will provide a more efficient system to keep water from leaking into the building, as well as provide an updated and modern look to the building.
METAL WALL PANELING ON UPPER EIFC
PORTION OF COMPLETED WALL
FRONT VIEW SHOWING STAGES OF EIFC INSTALL
NEW EXTERIOR WINDOWS
Installers from La Crosse Glass continued installation of the new windows this week. All ground floor and second level windows will be replaced in the building. There are a few windows in the office and library areas that need to be replaced, otherwise all other windows in the building have been installed. There is still finishing work on the exterior and interior of the windows that needs to be completed. The new ground floor windows will be a two panel aluminum window with horizontal slide. The new upper windows are fixed windows. The new windows will be much more energy-efficient, as well as giving the building a more modern look. Not to mention the amount of natural light the windows will give the classrooms and office spaces.
VIEW OF FINISHED WINDOW INSTALLATION
New solid surface sill on inside along with aluminum wrapped trim.
NEW UPPER LEVEL WINDOWS
OUTSIDE VIEW OF WINDOW INSTALLATION PREP
LOCKER ROOM RENOVATIONS
Contractors from Protective Coatings Specialists out of Appleton, WI were on site this week to begin installing the new epoxy floors. Several of the showers and bathrooms were completed this past week. This week, the plumbers will return to the district to finish installing fixtures and hardware, as well as electricians and HVAC completing their installations.
BATHROOM ADDITIONS
New epoxy flooring has been poured in most of the new and existing bathrooms. Plumbers will be back onsite this week to begin installing fixtures and putting the finishing touches on the bathrooms.
HIGHLIGHTED AREAS OF NEW BATHROOMS
SINGLE REST ROOM BEHIND LARGE GYM
TRIPLE RESTROOMS NEAR PERFORMANCE CENTER
ELEMENTARY CABINETS
The NC Maintenance crew has installed all new elementary cabinets. The cabinet makers, Foggy Bottoms, have installed all the new countertops, and made sure all the doors are hung and spaced correctly to give a final finished look. Strange Plumbing will be onsite to install the new classroom sinks and fixtures. We're excited for the additional storage space the new cabinets will provide, as well as providing a fresh new look in the elementary classrooms.
ELEMENTARY CLASSROOM CABINETS
ELEMENTARY CLASSROOM CABINETS
ELEMENTARY CLASSROOM CABINETS
NEW FLOORING
A crew from Protective Coating Specialists was onsite this past week to begin pouring the new epoxy flooring. The epoxy floors will replace old tile floors in the Commons and Bathrooms, hallway behind the Large Gym, maintenance hallway, Art hallway, and back middle school hallway, cafeteria, area outside of the Performance Center, and the existing flooring in the front hallway. Areas completed this past week included the Commons and bathrooms, hallway behind large gym, cafeteria, and area outside of the Performance Center. The crew will be onsite the next two weeks finishing the other areas.
FINISHED EPOXY FLOORING - COMMONS
FINISHED EPOXY FLOORING - HALLWAY
FINISHED EPOXY FLOORING - CAFETERIA
LIBRARY RENOVATIONS
The Library renovation project has seen the completion of new paint in the entire space, as well as new carpet tiles being installed in the entire space. We installed new Luxury Vinyl Tile in one small space which is used as a Makerspace in the Library for students. Later this summer we will see the installation of a new circulation desk, and new shelving and furnishing will be added throughout the school year. This is an ongoing project that likely won't be fully completed until later in the school year.
LIBRARY CARPET AND CABINETRY
LIBRARY CARPETING - MS/HS SIDE
LIBRARY CARPETING - ELEMENTARY SIDE
DAYCARE RENOVATIONS
We are excited to be able to expand our district daycare this year and add two additional classrooms. This will give us a total of four daycare rooms, allowing us to better divide the age levels, as well as increase the number of children and families we can provide care for. The daycare renovation project includes renovating the bathroom space to create a second bathroom, carpeting the two new infant and baby rooms, and installing a hallway door divider for continued noise reduction and privacy.
BATHROOM RENOVATIONS IN DAYCARE WING
NEW HALLWAY DIVIDER FOR DAYCARE WING
NEW CARPET IN 0-1 YEAR OLDS ROOM
COURTYARD DRAINAGE PROJECT
The sidwalks in the courtyard have been torn out, and regrading began in the courtyard area. An additional manhole has been installed in the courtyard, the entire area will be regraded, and a new concrete sidewalk has been poured. This project will allow water to drain properly, preventing any leakage into the building from water runoff.
EXCAVATION OF COURTYARD
NEW CONCRETE POURED IN COURTYARD
INSTALLATION OF NEW MANHOLE IN COURTYARD
SMALL GYM FLOOR REPLACEMENT
A small section of the Small Gym that received water damage last summer has been removed. In the coming weeks, new flooring will be installed in that area. The entire floor will be sanded, repainted, and refinished, resulting in a new Small Gym floor.
NEW GREENHOUSE
This past week the district broke ground on the site of the new North Crawford Greenhouse. The new 24' x 48', state of the art greenhouse, will serve the North Crawford Ag and FFA programs, as well as other classrooms and programs at North Crawford. We hope to partner with the community in the future to best utliize our greenhouse space. The greenhouse will be constructed later this fall.
COMPLETED PROJECTS
PARKING LOT AND SIDEWALK REPLACEMENT
New concrete parking lots and sidewalks have been poured. Fill is being added along all sidewalks and parking lots, with new grass seed being planted. All parking lots are open for visitor parking. Visitors to the building should park in the front or side parking lot. The back parking lot continues to be used by construction vehicles. The concrete parking lots will save the district thousands in maintenance each year over asphalt parking lots and sidewalks.
FRONT (SOUTH) PARKING LOT
STUDENT (WEST) PARKING LOT
VIEW OF FRONT (SOUTH) PARKING LOT
LARGE GYM FLOOR
Resurfacing of the large gym floor has been completed. We were happy to welcome our athletic teams back into the gym this past week for open gym. Stalker Sports Floors did a remarkable job of giving us a beautiful gym floor that we can be proud of for years to come.
UPCOMING PROJECTS
Several projects will be kicking off over the next couple of weeks. Those projects include:
- Refinishing Small Gym Floor
- Installation of Concrete Pad for New Greenhouse
- Renovation of Upper Maintenance Shed
- Installation of New Circulation Desk in the Library
ACCESS TO BUILDING
Much of our building is still accessible to staff, students, and the public. All of our parking lots are once again opened for visitor parking. We ask all visitors to the building to park in the front or side parking lot. The back parking lot is reserved for construction vehicles. This week, the maintenance hallway, Art hallway, and back middle school hallway, bathrooms, and locker rooms are off limits due to new flooring installation. All other areas of the building continue to be accessible.
GENERAL CONTRACTOR
We're proud to partner with Kraemer Bros. Construction as the school district's General Contractor, managing the selection of subcontractors, timelines, and project completion. The district previously worked with Kraemer Bros. in the construction of the new school in 1990-91, and the building addition in 1996. We proudly support a successful business based out of southwest Wisconsin (Plain, WI).
ENGINEERING, ARCHITECTURE, AND DESIGN
The district has been working with FEH Design out of Dubuque, IA for the past year on the design, architecture, and engineering of our projects. Kevin and his team at FEH assisted the district through the pre-referendum process, facilitating several community meetings and a community survey. They stayed with us through the referendum, and continue to work with the district on any design or architectural changes as construction is happening.
BOOTS ON THE GROUND
We are happy to support and partner with several Wisconsin subcontractors to complete work on our projects. Several of these subcontractors are from right here in southwest and western Wisconsin. Contractors and subcontractors on site this past week included:
Kraemer Bros. - Plain, WI
Higher Ground Roofing - Kewaskum, WI
MUZA Sheet Metal Company - Oshkosh, WI
Zimmerman Plumbing - Portage, WI
McCormick Electric - Gays Mills, WI
Winona Heating and Ventilation - La Crosse, WI
Showen Excavating - Gays Mills, WI
La Crosse Glass - La Crosse, WI
Luther & Weber Painting - Spring Green, WI
Hall Ceilings - Steuben, WI
Momchilovich Drywall & Paint - Platteville, WI
LARGE SCHOOL OPPORTUNITIES, SMALL SCHOOL VALUES
North Crawford School District
Email: bmunson@ncrawford.k12.wi.us